PPCC Library Integration Test

3. to enhance public safety and/or reduce visual impact, the Master Infrastructure Plan should provide for (1) metal rat

Document type
Minutes
Published date
February 28, 2026
Language
EN
Text status
Native
Topics
  • Governance
  • Potrero Canyon
  • Minutes

This document does not have a linked original file.

Extracted Text

3. to enhance public safety and/or reduce visual impact, the Master Infrastructure Plan should provide for (1) metal rather than wooden utility poles to be used wherever possible to support streetlights; (2) wireless telecommunications facilities or equipment that cannot feasibly be placed below-ground, such as antenna arrays, to be placed on and incorporated within the design of metal streetlights rather than on wooden poles or towers; (3) freestanding cellular towers to be eliminated or reduced, to the extent feasible and consistent with federal law and public safety needs; and (4) community input to be sought regarding the design of any new streetlights incorporating wireless telecommunications facilities or equipment and/or towers to support such equipment; and