PPCC Library Integration Test

1. That the maximum height of retaining walls in the side yard setbacks between two properties be set as the height betw

Document type
Minutes
Published date
May 5, 2016
Language
EN
Text status
Native
Topics
  • Governance
  • Potrero Canyon
  • Minutes

This document does not have a linked original file.

Extracted Text

1. That the maximum height of retaining walls in the side yard setbacks between two properties be set as the height between the graded surfaces of the two properties plus six feet.